Using Dev-Doc

Keep documentation up to date

Documentation is only useful while it matches the code. There are two ways to update a project.

Re-analyse

On My Projects, each card has a Reanalyse line: click the mode to switch between incremental and complete, then the play button.

Incremental Complete
What it does Keeps the existing analysis and fills the gaps Rebuilds the analysis and regenerates the documentation
Cost Only the missing work The whole project again
Use it when A run stopped or failed part-way, or you now want codebase analysis too You switched to a higher pricing model, or want everything fresh
Your edits Untouched You choose which to keep

Re-analysing uses the code you imported; it does not download the repository again.

Track a repository

Turn tracking on in the import dialog, or later with Connect repository on the project card. The card then offers:

  • Refresh documentation — downloads the latest commit and updates the documentation incrementally.
  • Check for updates — asks whether newer commits exist.
  • Edit connection — change the address, branch or access token.
  • Disconnect — stop tracking; the documentation stays.

If the repository has no new commits since the last run, a refresh is skipped and costs nothing.